|
We are proud to
have been part of the expansion project at one of the
busiest border crossings between international countries
in the world. It is reported that over 10,000
commercial vehicles pass through this crossing each
business day. Precast was utilized due to the
minimization of activity at the jobsite and the ease and
quickness with which it is installed.
The most
impressive elements, provided by The Prestressed Group,
were the forty – 90-foot long 1900 CPCI girders,
each weighing up to 100,000 lbs.
Many
production, shipping, and installation obstacles were
overcome due to the massive size of these components, as
well as the tight access restrictions required in order
to not disrupt traffic on the existing structure.
Precaster: Prestressed Systems Inc.
Project Manager: Maurice Adoranti
Owner: Canadian Trust Company
Contractor: L. V. Concorde |
 |
|